    55The following milestones have been achieved since the ORBIT project kicked off in the last quarter of 2003.
    66
     7 * 3/07 - Initial support for integrated experimentation and virtualization support demonstrated at the GENI Wireless Working Group Workshop
     8 * 3Q-06 - ORBIT infrastructure extended for vehicular experiments
     9 * 2Q-06 - Field trial system ready for initial user trials, outdoor radio grid begins final installation and trial tests.
     10 * 1Q-06 - 20x20 grid with mobility, etc., ready for general release.
     11 * 11/05 - 5 general use sandboxes released. 5 more sandboxes consisting of a kernel development platform, mote development environment, and GNU Radio   workbench also deployed.
     12 * 5/05 - Installation of 20x20 radio grid in new ORBIT facility. Trial experiments and calibration tests begin. Initial userbase begin adapting their experiments for deployment on large grid
     13 * 12/04 - 8x8 radio grid in ORBIT facility, v1.0 software, ready for initial user trials (limited emulator release)
     14 * 7/04 - 4x4 radio grid with DARPA pilot project experiments demonstrated during NSF site visit
     15 * 4/04 - 4x4 radio grid with new ORBIT radio node and v0.9 software (main functions implemented)
    716 * 1/04 - 2x2 radio grid with !CompuLab 586 nodes (trial hardware), API, user portal and Emulab cluster and simple network management.
    8  * 4/04 - 4x4 radio grid with new ORBIT radio node and v0.9 software (main functions implemented)
    9  * 7/04 - 4x4 radio grid with DARPA pilot project experiments demonstrated during NSF site visit
    10  * 12/04 - 8x8 radio grid in ORBIT facility, v1.0 software, ready for initial user trials (limited emulator release)
    11  * 5/05 - Installation of 20x20 radio grid in new ORBIT facility. Trial experiments and calibration tests begin. Initial userbase begin adapting their experiments for deployment on large grid
    12  * 11/05 - 5 general use sandboxes released. 5 more sandboxes consisting of a kernel development platform, mote development environment, and GNU Radio workbench also deployed.
    13  * 1Q-06 - 20x20 grid with mobility, etc., ready for general release.
    14  * 2Q-06 - Field trial system ready for initial user trials, outdoor radio grid begins final installation and trial tests.
    15  * 3Q-06 - ORBIT infrastructure extended for vehicular experiments
    16  * 3/07 - Initial support for integrated experimentation and virtualization support demonstrated at the GENI Wireless Working Group Workshop
     17 
    1718
    1819== Future Milestones ==