Changes between Version 19 and Version 20 of Hardware/dInfrastructure/qPowerMeasurment
- Timestamp:
- Aug 27, 2013, 7:10:05 PM (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Hardware/dInfrastructure/qPowerMeasurment
v19 v20 118 118 '''Future Work:''' 119 119 120 As this project continues 3 more sensors circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to the proper outlets. Once the entire ORBIT grid is connected, the power120 As this project continues 3 more sensors circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions: 121 121 122 122