    v20 v21  
    118118'''Future Work:'''
    119119
    120  As this project continues 3 more sensors circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions:   
    121 
     120As this project continues 3 more sensors circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions and many more:
     121[[BR]]   
     1221) Total displacement for all nodes.[[BR]]
     1232) Individual power status at a node.[[BR]]
     1243) Power consumption by user.[[BR]]
     1254) Power cycle event times per node.[[BR]]
     1265) Power used during a period of time.[[BR]]