Changes between Version 23 and Version 24 of Hardware/dInfrastructure/qPowerMeasurment
- Timestamp:
- Aug 29, 2013, 4:58:23 PM (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Hardware/dInfrastructure/qPowerMeasurment
v23 v24 122 122 '''Future Work:''' 123 123 124 For future work and development of this project, 3 more sensor scircuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions and many more:124 For future work and development of this project, 3 more sensor circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions and many more: 125 125 [[BR]] 126 126 1) Total displacement for all nodes.[[BR]]