Changes between Version 23 and Version 24 of Hardware/dInfrastructure/qPowerMeasurment


Ignore:
Timestamp:
Aug 29, 2013, 4:58:23 PM (11 years ago)
Author:
pavan717
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Hardware/dInfrastructure/qPowerMeasurment

    v23 v24  
    122122'''Future Work:'''
    123123
    124 For future work and development of this project, 3 more sensors circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions and many more:
     124For future work and development of this project, 3 more sensor circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to their proper outlets. Once the entire ORBIT grid is connected the power reading will have to be deaggregated to determine the power status of each node individually. This is because each breaker switch has up to 12 nodes connected to it, deaggregting this data will help answer the following questions and many more:
    125125[[BR]]   
    1261261) Total displacement for all nodes.[[BR]]