Changes between Version 19 and Version 20 of Other/Summer/2024/lLM
- Timestamp:
- Jul 24, 2024, 7:30:26 PM (4 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Other/Summer/2024/lLM
v19 v20 116 116 3. **Termination Control**: We also worked on adding more specific termination control for Maestros. Previously, running the end_experiment script would terminate all Maestros, or at least attempt to do so. Hence, even if only one was running, it would try and connect to each every Maestro, of which there are more than 30 total, and this process was inefficient. Hence, we wanted to add a feature that could shut off specified Maestros and give the user more control and efficient workflow when interacting with the Maestros. It is still a work in progress, with tr, and it should be finalized by the upcoming week. 117 117 118 4. **Git Hub Documentation** We worked on documentation with the installations of the dependencies. Even though imaging was considered the best method to have all Maestros with the required dependencies to run, using the other method, installing dependencies from a fresh Raspberry Pi SD card, is still important to understand how the working Maestros came to be and to have a reference on how to create your own working Maestro for experimentation.118 4. **Git Hub Documentation** We worked on finishing installing the dependencies for a Maestro and documenting it. Even though imaging was considered the best method to have all Maestros with the required dependencies to run, using the other method, installing dependencies from a fresh Raspberry Pi SD card, is still important to understand how the working Maestros came to be and to have a reference on how to create your own working Maestro for experimentation. 119 119 120 120 Week 4