Changes between Version 24 and Version 25 of Other/Summer/2024/ml5G
- Timestamp:
- Jul 22, 2024, 3:43:31 PM (4 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Other/Summer/2024/ml5G
v24 v25 140 140 == Week 7 (7/8 - 7/11) 141 141 Finalized a plan for SINR calculations in the scope of the experiment: 142 142 143 Step 1: Use 1st SNR implementation with satellite transmitter and receiver to measure signal and noise powers. 144 143 145 Step 2: Use 2nd SNR implementation with the OFDM transmitter and receiver to measure the second signal power (equivalent to interference values). 146 144 147 Step 3: Use the three values to calculate the SINR values that would occur if both OFDM transmitter and satellite were used simultaneously. 145 148