Changes between Version 24 and Version 25 of Other/Summer/2024/ml5G


Ignore:
Timestamp:
Jul 22, 2024, 3:43:31 PM (4 months ago)
Author:
agrandhi4
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Other/Summer/2024/ml5G

    v24 v25  
    140140== Week 7 (7/8 - 7/11)
    141141Finalized a plan for SINR calculations in the scope of the experiment:
     142
    142143Step 1: Use 1st SNR implementation with satellite transmitter and receiver to measure signal and noise powers.
     144
    143145Step 2: Use 2nd SNR implementation with the OFDM transmitter and receiver to measure the second signal power (equivalent to interference values).
     146
    144147Step 3: Use the three values to calculate the SINR values that would occur if both OFDM transmitter and satellite were used simultaneously. 
    145148