Version 7 (modified by 11 years ago) ( diff ) | ,
---|
Assembly of 4 node group
Requires:
- Console (LV-67J)
- 3 Nodes (LV-67K)
— LV-67J — Assemble as with G except: (put link to node specific page)
- 1 160GB HDD on tray, with standoffs (add picture)
- Power button in back panel
- No CM
— LV-67K — Assemble as with G except: (put link to node specific page)
- DO NOT CONNECT 4 PIN ATX12V POWER CABLE
- Mobile node uses connector for 12V dc input, with 24 pin connector acting as output. Connecting both will damage board.
- Connect new CM, attach to back panel with angle bracket, #440 screws. Choose beveled or pan head appropriately.
- Use 60gb SSD on tray, with standoffs. (add picture)
Network setup and configuration
- Three networks
- Data
- CM
- Control
- 3 switches, 1 partitioned switch, or single cable out.
Attachments (3)
- 4Node_1.png (80.3 KB ) - added by 11 years ago.
- 4Node_2.png (67.6 KB ) - added by 11 years ago.
- 4Node_3.png (90.8 KB ) - added by 11 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.